Industry
Projects by industry
Choose an industry first to find references close to your application.
MY ARKAINDUSTRIAL
Save selection and procurement time with catalog routes, technical files, and structured RFQ.
ثبت نام Sign in Open accountGlobal sales desk
Pick the next route from catalog, documents, or RFQ.
This bar keeps product, industry, service, and request routes close on every page.
{{ labels.eyebrow }}
{{ labels.description }}
Projects
See selected project references and implementation context.
Industry
Choose an industry first to find references close to your application.
Brand
If a brand or supplier is known, review references from that route first.
Next step
After reviewing a reference, connect the relevant service or product to your request.
Action path
These routes help users move from browsing to selection, then to RFQ or contact.
Proof
Look for references from the closest operating context first.
Brand
If a preferred supplier is known, use the brand route first.
Next step
After reviewing a reference, move into a structured request or contact.
2 projects found
Project
Drive replacement route for packaging equipment with motor data review and panel-space constraints. The project is anonymized for public review while preserving the decision path and technical intake structure.
Project
Energy monitoring and panel component path for facility electrical visibility and reporting. The project is anonymized for public review while preserving the decision path and technical intake structure.
News
Latest admin-published news, projects, products, and updates appear here.
ژوئن 2, 2026
The current dataset now resolves datasheet, brochure, download, case-study, and certificate links through local theme assets. This keeps the document routes consistent for archive browsing, search, and RFQ review while the owner media set is managed.
ژوئن 2, 2026
The catalog now groups flow, pressure, level, temperature, analytical, PLC, drive, energy, networking, and panel-component routes. Catalog, filters, and RFQ paths now have enough data density for realistic local review.
ژوئن 2, 2026
Downloads and certificates now carry access-level metadata so public documents and restricted technical resources can be managed separately. Approved-account gating is assigned to commissioning, hazardous-area, material-declaration, and case-study reference files.
ژوئن 2, 2026
Product and service records now explain which process, installation, model, and document details should travel into an RFQ. The RFQ path can now be reviewed with more realistic product and filter contexts.
ژوئن 2, 2026
Machine and panel inquiries can start from I/O count, motor data, HMI size, network needs, power supply, and enclosure constraints. This keeps the storefront anchored to a practical automation path without adding commerce checkout scope.
ژوئن 2, 2026
Water, chemical, food, oil and gas, power, OEM, mining, and building routes now connect to products, services, projects, and case studies. Archive counts and related sections should feel closer to a production catalog review.